Out of My Mind

Out of My Mind

Sunday, August 31, 2008

This is the year of the rennovations....

We have spent mega bucks on the house this year getting it the way we want it.. we're taking pictures of the house and all of the things we have installed or fixed up and are going to create a binder showing all that we have done.. in addition to being a great remembrance book it will be a way to document the improvements we have made to the place in case we were to sell it in the future (it better be waaaay in the future because I want to enjoy the place once it's completed)...

and in no particular order... Ron did/we had someone come in and do the following...
- Ron replaced the roof.. that was more than a little dangerous!
- Ron replaced the upstairs bedroom window
- our furnace went and we had to have it replaced
- we got a new water pressure tank for the well to increase the water flow
- we got a hole dug and a sump bucket installed for the new sump pump
- Ron redid over the whole interior of the house.. or at least 90% of it by..
- installed new laminate floors through most of the house
- painted or wallpapered the interiour
- the electrician installed a new breaker box to replace the old fuse box
- we bought a new electric hot water heater to be installed in the near future
- we have a new pellet stove
- Ron replaced the dining room, kitchen, downstairs bathroom and downstairs walk-in closet windows and has one for the den to replace
- Ron's in the process of putting new insulation and siding on the house
- We put blown in insulation in the lower attic
- since we moved in we replaced the washer, dryer and just got a new fridge
- we had the electrician install a new circuit upstairs so that we can run a heater in the winter if necessary
- Ron replaced the sink in the upstairs bathroom
- Ron built a little shed for the ride on lawnmower
- Ron did work on the old garage/workshop, insulated and replaced the roof as well as put in a wooden floor over the old clay floor

I think that's everything we've done so far..

what we want to do in the future is....
- replace the bathroom window and the upstairs other bedroom window
- put in a shower downstairs
- replace the stove
- replace the dishwasher
- redo the driveway
- install a water softener system
- do something about the basement
- fix the window by the back door **done**
- redo the floors in the main bedroom downstairs and do over the new bathroom
- replace the tub and toilet in the upstairs bathroom (that may not get done).

So our "to do" list is a lot shorter than our "done" list..

No comments: